Installation Tools for Glass-Fused-to-Steel (GFS) Bolted Tanks

The glass-fused-to-steel (GFS) bolted tank is assembled on site from factory-prefabricated glass-fused-to-steel panels using high-strength bolts and special sealant, requiring no on-site welding throughout the process. For this very reason, "how the tank is erected" directly determines the project schedule, cost and installation quality.

    description

    GFS bolted tank installation requires no large welding equipment or welders.

    The core tools are configured in four categories — "fastening, sealing, measuring and lifting":

    • Torque wrench: The core fastening tool. Bolts must be tightened diagonally in stages to the specified torque values — insufficient torque causes leakage at panel joints, while excessive torque may crack the enamel coating and expose the steel substrate to corrosion, making it the No. 1 control point for installation quality;
    • Special sealant and sealant gun:The joint sealing material. Silicone sealant is embedded between the overlapping panels; after curing it forms a highly elastic, rubber-like seal with strong heat resistance and weatherability, working together with the bolt preload to ensure the tank's tightness;
    • Self-locking bolts:Bolts with a self-locking device at the root and corrosion-protected wrapping on the water-side end, providing reliable connections that are anti-loosening and durable;
    • Lifting device: The core power equipment for inverted erection, providing synchronized jacking;
    • Tape measure, spirit level and theodolite:Used to check the tank diameter, roundness and verticality after each ring course is assembled, correcting deviations in time to prevent error accumulation;
    • Small forklift and lifting slings:For on-site transfer and positioning of panels, with no large crane required.
    20261029-162650 87353a5e6481caf9053fb6ce3c2b13
    torque wrench  sealant gun
    b8aab4dc2bee57a9cfc21617bd19a1 b107751d4cab2504bd782e430dff8d
    sealant       self-locking bolts

    Installation Procedure:

    The GFS bolted tank is erected by the inverted erection method: first, the first ring course of wall panels is assembled on the ground; after the roundness and verticality are corrected, the entire ring is jacked up with the hydraulic jacking system. The second ring course is then assembled underneath and jacked up again — repeating the cycle of "one ring assembled, one ring jacked" until all wall panel courses are in place. Finally, the roof (or gas collection hood) and hot-dip galvanized stiffening rings are installed, followed by torque re-tightening, seal inspection and the water-filling/air-tightness test. The tank is put into service after passing acceptance.

    bb3ff9adb05931d4c10dff14e359ab-1

    Advantages of the Inverted Erection Method

    • No work at height, safe and controllable: The entire installation is basically completed at ground level, eliminating the risk of falls from height and significantly reducing on-site HSE risks;
    • No large lifting equipment required: Eliminates the occupation of large crane shifts, particularly suitable for construction sites with confined spaces and inconvenient access;
    • No full scaffolding required: Eliminates scaffolding erection and load calculation, reducing both material and labor input;
    • Significantly shortened construction period:Industry practice shows that the inverted erection method can save more than 35% of the time compared with conventional processes, and the construction period of a 5,000 m³ bolted tank can be shortened by more than one-third compared with traditional processes;
    • Overall cost savings: Reduces large machinery shifts and scaffolding input, saving at least 20% of the cost;
    • Low equipment amortization: Core equipment such as the hydraulic jacking system can be reused across multiple projects, with high resource utilization and sound technical and economic benefits.

    737504a92f47e56bccc5c28255baf6

    Core Advantages of the Glass-Fused-to-Steel (GFS) Bolted Tank:

    • Welding-free throughout, installable in all seasons: The tank is assembled with bolted connections and no on-site welding, requiring no hot-work approval and not constrained by power supply or welder qualifications; installation can proceed even in severe winter, keeping both safety and schedule under control;
    • Modular quick assembly, construction period counted in days: Standardized panel modules combined with the bolted assembly process mean a single tank can be erected in just days to weeks, greatly compressing on-site installation time;
    • Relocatable, asset value preserved: Supports repeated dismantling, long-distance transport and reinstallation at new sites, with complete component reuse and high residual value — one procurement serves long-term turnover across multiple projects;
    • Dense corrosion-resistant enamel coating, service life of over 30 years:The glass-enamel coating is fired at high temperature, dense and resistant to acid and alkali, maintaining stable anti-corrosion performance throughout the tank's design service life of more than 30 years;
    • Expandable without rebuilding, more economical upgrades: When a larger tank capacity is needed later, additional panel modules can simply be installed to complete the upgrade without rebuilding the tank, maximizing investment utilization.

     