Installation Tools for Glass-Fused-to-Steel (GFS) Bolted Tanks
description
GFS bolted tank installation requires no large welding equipment or welders.
The core tools are configured in four categories — "fastening, sealing, measuring and lifting":
- Torque wrench: The core fastening tool. Bolts must be tightened diagonally in stages to the specified torque values — insufficient torque causes leakage at panel joints, while excessive torque may crack the enamel coating and expose the steel substrate to corrosion, making it the No. 1 control point for installation quality;
- Special sealant and sealant gun:The joint sealing material. Silicone sealant is embedded between the overlapping panels; after curing it forms a highly elastic, rubber-like seal with strong heat resistance and weatherability, working together with the bolt preload to ensure the tank's tightness;
- Self-locking bolts:Bolts with a self-locking device at the root and corrosion-protected wrapping on the water-side end, providing reliable connections that are anti-loosening and durable;
- Lifting device: The core power equipment for inverted erection, providing synchronized jacking;
- Tape measure, spirit level and theodolite:Used to check the tank diameter, roundness and verticality after each ring course is assembled, correcting deviations in time to prevent error accumulation;
- Small forklift and lifting slings:For on-site transfer and positioning of panels, with no large crane required.
![]() |
![]() |
| torque wrench | sealant gun |
![]() |
![]() |
| sealant | self-locking bolts |
Installation Procedure:
The GFS bolted tank is erected by the inverted erection method: first, the first ring course of wall panels is assembled on the ground; after the roundness and verticality are corrected, the entire ring is jacked up with the hydraulic jacking system. The second ring course is then assembled underneath and jacked up again — repeating the cycle of "one ring assembled, one ring jacked" until all wall panel courses are in place. Finally, the roof (or gas collection hood) and hot-dip galvanized stiffening rings are installed, followed by torque re-tightening, seal inspection and the water-filling/air-tightness test. The tank is put into service after passing acceptance.

Advantages of the Inverted Erection Method
- No work at height, safe and controllable: The entire installation is basically completed at ground level, eliminating the risk of falls from height and significantly reducing on-site HSE risks;
- No large lifting equipment required: Eliminates the occupation of large crane shifts, particularly suitable for construction sites with confined spaces and inconvenient access;
- No full scaffolding required: Eliminates scaffolding erection and load calculation, reducing both material and labor input;
- Significantly shortened construction period:Industry practice shows that the inverted erection method can save more than 35% of the time compared with conventional processes, and the construction period of a 5,000 m³ bolted tank can be shortened by more than one-third compared with traditional processes;
- Overall cost savings: Reduces large machinery shifts and scaffolding input, saving at least 20% of the cost;
- Low equipment amortization: Core equipment such as the hydraulic jacking system can be reused across multiple projects, with high resource utilization and sound technical and economic benefits.

Core Advantages of the Glass-Fused-to-Steel (GFS) Bolted Tank:
- Welding-free throughout, installable in all seasons: The tank is assembled with bolted connections and no on-site welding, requiring no hot-work approval and not constrained by power supply or welder qualifications; installation can proceed even in severe winter, keeping both safety and schedule under control;
- Modular quick assembly, construction period counted in days: Standardized panel modules combined with the bolted assembly process mean a single tank can be erected in just days to weeks, greatly compressing on-site installation time;
- Relocatable, asset value preserved: Supports repeated dismantling, long-distance transport and reinstallation at new sites, with complete component reuse and high residual value — one procurement serves long-term turnover across multiple projects;
- Dense corrosion-resistant enamel coating, service life of over 30 years:The glass-enamel coating is fired at high temperature, dense and resistant to acid and alkali, maintaining stable anti-corrosion performance throughout the tank's design service life of more than 30 years;
- Expandable without rebuilding, more economical upgrades: When a larger tank capacity is needed later, additional panel modules can simply be installed to complete the upgrade without rebuilding the tank, maximizing investment utilization.